Strict quality control



1. Technical plan optimization, production drawing optimization, drawing review.
2. Inspection of material suppliers to confirm procurement.
3. Inspection in the production process, production inspection tracking card, inspection daily report.
4. Complete product inspection, operation test and factory inspection report.
5. On-site installation condition inspection, on-site installation test, complete the inspection report.
Quality Director::Charlie